Remove MRP Remove Study Remove Tools
article thumbnail

Boeing: The Turning Point(s)

The Lean Thinker

With the justification aside, they next had us go through exercises calculating net present value and ROI for a hypothetical capital investment in tooling – as though a shop floor supervisor would do this at any point in the course of their job. These study missions were quite eye-opening for the participants.

article thumbnail

What is a “Socio-Technical System?”

The Lean Thinker

The study I am citing here was commissioned to determine why. this is particularly true in ERP / MRP environments.) Instead, we should look at the information system as a tool that should enable people do to a job they otherwise could not. Productivity plummeted. They do nothing. On the Shop Floor. What is actually happening?

Insiders

Sign Up for our Newsletter

This site is protected by reCAPTCHA and the Google Privacy Policy and Terms of Service apply.

article thumbnail

How to Get a Job in the Supply Chain Sector

Logistics Bureau

One study shows that one in three companies in the United States has jobs that are taking nine to 12 months to fill. Another study reveals that the demand for supply chain talent exceeds supply by 6 to 1. If university study is a little beyond you right now, one of the certification courses might work better for you.

article thumbnail

Manufacturing And Cloud Reluctance: What We Learned

GlobalTranz

One report dealt with the buying trends of companies in the market for MRP Software , while the other surveyed 154 manufacturers who shared their thoughts on their active use of technology. When it comes to MRP Software, buyers are 45% less likely to have a preference for hosted systems compared to all other business systems.

MRP 54